Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 28, 2020, 04:16 AM
  • 18 0579_18 0284 _05272020_215000.mp4

Date
05/27/2020
W/O
SC411368
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00702
PipeID
P14113
Time
9:16 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7711
Sewer Name
18 SHOEMAKER AVENUE TRUNK
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_828934_TV18178_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0579
Downstream MH
18 0284
Dir. of Survey
Downstream
Length Surveyed
363 ft.
Total Length
363 ft.
Structural Index
3
Structural Quick
3M00
Structural Rating
216
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
216
Pipe schematic from manhole 18 0579 to 18 0284
MH: 18 0579MH: 18 0284downstream0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 05790 ft. MWL - Water Level, 10 %of cross sectional area2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start21.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"24.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"76.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"122.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"124.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"173.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"177 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"221.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"226.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"273.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"277.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"326.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"328.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"363 ft. AMH - Downstream Manhole, Survey Ends - 18 0284363 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
76.4TFC
173.8TF
363AMH18 0284
2.1SAV
122.6TFC
0MGOCONNECTION AT MH, 3 O'CLOCK
0MWM
273.8TFC
124.5TFC
24.9TFC
177TFC
0AMH18 0579
221.8TFC
277.4TFC
328.4TFC
226.2TFC
326.7TFC
21.2TFC
0MWL
363SAV

Properties (6)

additional_info
SC411368
custom_field_two
3
customer
LACSD
datetime
2020-05-27T21:16:45-07:00
documentation
PROPIPE
is_lateral_inspection
false