Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 28, 2020, 05:36 AM
  • 18 0283_18 0282 _05272020_225418.mp4

Date
05/27/2020
W/O
828934
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00702
PipeID
P14111
Time
10:36 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7711
Sewer Name
18 SHOEMAKER AVENUE TRUNK
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_828934_TV18178_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0283
Downstream MH
18 0282
Dir. of Survey
Downstream
Length Surveyed
356.5 ft.
Total Length
356.5 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
355
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
355
Pipe schematic from manhole 18 0283 to 18 0282
MH: 18 0283MH: 18 0282downstream0 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 02830 ft. MWL - Water Level, 15 %of cross sectional area2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start54.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"55.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"102 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"104.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"153 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"156.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"204.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"208.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"253.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"257.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"305.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"308.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"356.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish356.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish356.5 ft. AMH - Downstream Manhole, Survey Ends - 18 0282

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
0MGOCONNECTION AT MH, 9 O'CLOCK
356.5SSS
2.1SAV
356.5SAV
0MGOCONNECTION AT MH, 3 O'CLOCK
0MWM
55.8TFC
102TFC
308.2TF
356.5AMH18 0282
204.6TFC
0AMH18 0283
257.1TFC
153TFC
305.9TFC
0MWL
208.1TFC
104.5TFC
54.1TFC
156.1TFC
253.4TFC
2.1SSS

Properties (6)

additional_info
SC411368
custom_field_two
3
customer
LACSD
datetime
2020-05-27T22:36:48-07:00
documentation
PROPIPE
is_lateral_inspection
false