Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 28, 2020, 07:02 AM
  • 18 0281_18 0280 _05282020_001832.mp4

Date
05/28/2020
W/O
828934
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00702
PipeID
P14109
Time
12:02 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7711
Sewer Name
18 SHOEMAKER AVENUE TRUNK
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_828934_TV18178_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0281
Downstream MH
18 0280
Dir. of Survey
Downstream
Length Surveyed
343.1 ft.
Total Length
343.1 ft.
Structural Index
3
Structural Quick
3M2K
Structural Rating
320
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
322
Pipe schematic from manhole 18 0281 to 18 0280
MH: 18 0281MH: 18 0280downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 02810 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start14.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"17.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"54.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start65.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"68.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"114.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"117.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"139 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"163.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"166.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"212 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"215 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"263.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"266.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"315.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"318.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"329.4 ft. OBZ - Obstacles Other, 10 %of cross sectional area, at 04 o'clock343.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish343.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish343.1 ft. AMH - Downstream Manhole, Survey Ends - 18 0280

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    54.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Obstacles Other, 10 %of cross sectional area, at 04 o'clock

    329.4 ft. - Obstacles Other, 10 %of cross sectional area, at 04 o'clock

Observations (24)

DistanceCodeObservation
318.5TF
14.3TFC
65.8TFC
215TFC
315.4TFC
117.5TFC
114.7TF
2.1SAV
212TFC
329.4OBZ
0AMH18 0281
263.5TFC
343.1SAV
139TF
17.4TFC
54.9SSS
343.1SSS
266.5TFC
343.1AMH18 0280
163.1TFC
0MWL
0MWM
166.3TFC
68.7TFC

Properties (6)

additional_info
SC411368
custom_field_two
3
customer
LACSD
datetime
2020-05-28T00:02:50-07:00
documentation
PROPIPE
is_lateral_inspection
false