Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 28, 2020, 10:23 AM
  • 18 0444_18 0443 _05282020_033829.mp4

Date
05/28/2020
W/O
828932
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00675
PipeID
P14295
Time
3:23 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7712
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SANTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_828932_TV18097_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0444
Downstream MH
18 0443
Dir. of Survey
Downstream
Length Surveyed
289.4 ft.
Total Length
289.4 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
171
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
171
Pipe schematic from manhole 18 0444 to 18 0443
MH: 18 0444MH: 18 0443downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 04440 ft. MWM - Water Mark, 20 %of cross sectional area2.1 ft. SAV - Surface Aggregate Visible, 08 to 04 o'clock, within 8 inches of joint: YES, Start11.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"35.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"63.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"87.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"112.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"140.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"165.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"189.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"213.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"237.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"261.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"289.1 ft. SAV - Surface Aggregate Visible, 08 to 04 o'clock, within 8 inches of joint: YES, Finish289.4 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK289.4 ft. AMH - Downstream Manhole, Survey Ends - 18 0443289.4 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK

Observation photos (1)

  • Surface Aggregate Visible, 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
289.1SAV
261.3TFC
140.6TFC
289.4MGOCONNECTION AT MH, 9 O'CLOCK
0MWL
63.6TFC
0AMH18 0444
289.4AMH18 0443
165.3TFC
35.8TFC
2.1SAV
0MWM
87.9TFC
237.4TFC
289.4MGOCONNECTION AT MH, 3 O'CLOCK
112.5TFC
11.9TFC
189.4TFC
213.4TFC

Properties (6)

additional_info
SC411369
custom_field_two
3
customer
LACSD
datetime
2020-05-28T03:23:15-07:00
documentation
PROPIPE
is_lateral_inspection
false