- Date
- 04/30/2020
- W/O
- 828940
- Weather
- Dry
- Operator/Surveyor
- S. LOPEZ
- Sewer ID
- Z00843
- PipeID
- P19653
- Time
- 10:41 PM
- Certificate
- U-111-11880
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K7548
- Sewer Name
- 32 SOLEDAD CANYON RELIEF TRUNK
- City
- SANTA CLARITA
- Loc. details
- Main Highway - Suburban/Rural
- Location Code
- B
- Use of Sewer
- Sanitary Sewer
- District
- District 32
- Page No.
- 09
- Purpose
- Routine Assessment
- Project
- RFIR_WO_828940_TV32050_MAY2020
- Sewer Type
- Gravity
- Material
- Reinforced Concrete Pipe
- Shape
- Circular
- Height
- 27 in.
- Width
- 27 in.
- Upstream MH
- 32 1199
- Downstream MH
- 32 1198
- Dir. of Survey
- Downstream
- Length Surveyed
- 458.9 ft.
- Total Length
- 458.9 ft.
- Structural Index
- 3
- Structural Quick
- 4P3Q
- Structural Rating
- 798
- O&M Index
- 2
- O&M Quick
- 472Q
- O&M Rating
- 210
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 1008
Pipe schematic from manhole 32 1199 to 32 1198 Observation photos (4)

2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

8.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

23.9 ft. - Water Level, Sag in pipe, 80 %of cross sectional area, Start