Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 11, 2020, 09:59 AM
  • 18 0743_18 0742 _05112020_032948.mp4

Date
05/11/2020
W/O
828928
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00706
PipeID
P14596
Time
2:59 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7596
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
RFIR_WO_828928_TV18103_MAY2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
18 0743
Downstream MH
18 0742
Dir. of Survey
Downstream
Length Surveyed
93.6 ft.
Total Length
93.6 ft.
Structural Index
4
Structural Quick
5131
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
8
Pipe schematic from manhole 18 0743 to 18 0742
MH: 18 0743MH: 18 0742downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 07432.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - INFREQUENTLY THROUGHOUT93.6 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK93.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish93.6 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish93.6 ft. AMH - Downstream Manhole, Survey Ends - 18 0742

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - INFREQUENTLY THROUGHOUT

    3 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - INFREQUENTLY THROUGHOUT

Observations (9)

DistanceCodeObservation
2.1SAP
93.6MGOCONNECTION AT MH 3 O'CLOCK
93.6SAP
0MWM
3SRVINFREQUENTLY THROUGHOUT
0MWL
93.6SRV
93.6AMH18 0742
0AMH18 0743

Properties (6)

additional_info
SC411355
custom_field_two
2
customer
LACSD
datetime
2020-05-11T02:59:34-07:00
documentation
PROPIPE
is_lateral_inspection
false