Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 21, 2020, 06:11 AM
  • 18 0105_18 0104 _05202020_232006.mp4

Date
05/20/2020
W/O
828920
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00698
PipeID
P13925
Time
11:11 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7708
Sewer Name
18 SANTA FE STREET TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_828920_TV18177_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0105
Downstream MH
18 0104
Dir. of Survey
Downstream
Length Surveyed
170.3 ft.
Total Length
170.3 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
195
O&M Index
2
O&M Quick
2F00
O&M Rating
66
Overall Index
3
Overall Quick
Overall Rating
261
Pipe schematic from manhole 18 0105 to 18 0104
MH: 18 0105MH: 18 0104downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Begins - 18 01050 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start10.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start21 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"35.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN39.6 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6" - OPEN66.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"69.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"118.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"120.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"168 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish169.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish169.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish170.3 ft. AMH - Downstream Manhole, Survey Ends - 18 0104170.3 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK CAPPED170.3 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK CAPPED

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    10.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
39.6TFOPEN
169.8SAV
168DAGS
0MGOROACHES @ MH
0AMH18 0105
0MWM
21TFC
69.4TFA
2.5SAV
66.4TFC
2DAGS
169.7CM
10.8CM
120.6TFC
170.3AMH18 0104
0MWL
118.3TFC
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
170.3MGOCONNECTION AT MH 3 O'CLOCK CAPPED
35.8TFOPEN
170.3MGOCONNECTION AT MH 9 O'CLOCK CAPPED

Properties (6)

additional_info
SC411365
custom_field_two
3
customer
LACSD
datetime
2020-05-20T23:11:06-07:00
documentation
PROPIPE
is_lateral_inspection
false