Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 21, 2020, 07:35 AM
  • 18 0101_18 0100 _05212020_004326.mp4

Date
05/21/2020
W/O
828920
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00698
PipeID
P13921
Time
12:35 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7708
Sewer Name
18 SANTA FE STREET TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_828920_TV18177_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0101
Downstream MH
18 0100
Dir. of Survey
Downstream
Length Surveyed
130.2 ft.
Total Length
130.2 ft.
Structural Index
3
Structural Quick
3F00
Structural Rating
105
O&M Index
2
O&M Quick
2D00
O&M Rating
50
Overall Index
3
Overall Quick
Overall Rating
155
Pipe schematic from manhole 18 0101 to 18 0100
MH: 18 0101MH: 18 0100downstream0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 01012 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start24.3 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES31.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"34.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"83.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"86.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"91.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start128 ft. MGO - General Observation - ROACHES @ MH128 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish130.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish130.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish130.2 ft. AMH - Downstream Manhole, Survey Ends - 18 0100

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    24.3 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    91.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
2DAGS
128MGOROACHES @ MH
34.2TFC
0MGOCONN @ MH 3 O'CLOCK/UNKNOWN
24.3CM
130.2SAV
130.2CM
130.2AMH18 0100
0MGOROACHES @ MH
0MWM
91.4CM
86.8TFC
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
128DAGS
31.5TFC
0MWL
0AMH18 0101
83.1TFC
2.2SAV

Properties (6)

additional_info
SC411365
custom_field_two
3
customer
LACSD
datetime
2020-05-21T00:35:49-07:00
documentation
PROPIPE
is_lateral_inspection
false