Wastewater/Activity/PacpInspection/1.0Apr 30, 2020, 08:25 AM
  • 14 0418_14 0417 _04302020_013715.mp4

Date
04/30/2020
W/O
828878
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P18501
Time
1:25 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7546
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_828878_TV14019_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0418
Downstream MH
14 0417
Dir. of Survey
Downstream
Length Surveyed
332.6 ft.
Total Length
332.6 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
330
O&M Index
2
O&M Quick
412L
O&M Rating
136
Overall Index
2
Overall Quick
Overall Rating
466
Pipe schematic from manhole 14 0418 to 14 0417
MH: 14 0418MH: 14 0417downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 04182 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start11 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - UNKNOWN35.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"60.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"85.1 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"108.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"132.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"157.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"210.8 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"235 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"258.8 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"287.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"312.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"330.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish330.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish330.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish332.6 ft. AMH - Downstream Manhole, Survey Ends - 14 0417

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
312.1TFC
108.5TFC
85.1TFC
2SAP
0MWL
330.2SAP
332.6AMH14 0417
330.2SSS
11TFUNKNOWN
287.4TFC
2DAGS
157.8TFC
0MWM
258.8TFC
35.5TFC
60.5TFC
210.8TFC
132.9TFC
0AMH14 0418
2SSS
235TFC
330.2DAGS