Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 29, 2020, 05:22 AM
  • 14 0432_14 0431A _04282020_223854.mp4

Date
04/28/2020
W/O
828878
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P18517
Time
10:22 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7545
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_828878_TV14019_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0432
Downstream MH
14 0431A
Dir. of Survey
Downstream
Length Surveyed
208.3 ft.
Total Length
208.3 ft.
Structural Index
2
Structural Quick
3G2O
Structural Rating
277
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
2
Overall Quick
Overall Rating
283
Pipe schematic from manhole 14 0432 to 14 0431A
MH: 14 0432MH: 14 0431Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 04320 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start2 ft. MGO - General Observation - 65% MAG COAT2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start21.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish21.6 ft. MMC - Material Change, Vitrified clay pipe21.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish23.6 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"31.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start31.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start31.5 ft. MMC - Material Change, Concrete pipe (non-reinfored)59.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"84.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"133.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"157.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"186.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"189.8 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: YES205.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish205.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish206 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish208.3 ft. AMH - Downstream Manhole, Survey Ends - 14 0431A208.3 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/

Observation photos (6)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Material Change, Vitrified clay pipe

    21.6 ft. - Material Change, Vitrified clay pipe

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    31.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    31.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, at 09 o'clock,  , within 8 inches of joint: YES

    189.8 ft. - Deposits Attached Grease, 10 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: YES

Observations (25)

DistanceCodeObservation
2SAP
205.2SAP
31.5SSS
206MWLS
157.9TFC
208.3AMH14 0431A
21.6SSS
21.6MMC
0AMH14 0432
2MWLS
0MWL
59.9TFC
2MGO65% MAG COAT
0MWM
208.3MGOCONN @ MH 9 O'CLOCK/
31.5SAP
31.5MMC
23.6TBA
205.2SSS
186.2TFA
189.8DAGS
21.6SAP
133.7TFC
84.1TFC
2SSS

Properties (6)

additional_info
SC411236
custom_field_two
2
customer
LACSD
datetime
2020-04-28T22:22:30-07:00
documentation
PRO PIPE
is_lateral_inspection
false