Wastewater/Activity/PacpInspection/1.0Apr 30, 2020, 06:11 AM
  • 14 0421_14 0420A _04292020_232302.mp4

Date
04/29/2020
W/O
828878
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P18505
Time
11:11 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7546
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_828878_TV14019_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0421
Downstream MH
14 0420A
Dir. of Survey
Downstream
Length Surveyed
187.5 ft.
Total Length
187.5 ft.
Structural Index
3
Structural Quick
3F2F
Structural Rating
185
O&M Index
2
O&M Quick
2F00
O&M Rating
74
Overall Index
2
Overall Quick
Overall Rating
259
Pipe schematic from manhole 14 0421 to 14 0420A
MH: 14 0421MH: 14 0420Adownstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 04212 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 60% MAG COAT2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start11.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"36.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"61.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"85.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"109.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"133.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"185.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish185.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish185.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish187.5 ft. AMH - Downstream Manhole, Survey Ends - 14 0420A187.5 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
109.7TFC
2SAP
185.6SSS
187.5AMH14 0420A
187.5MGOCONN @ MH 9 O'CLOCK/ACTIVE
61.1TFC
0MWL
85.2TFC
0MWM
2MGO60% MAG COAT
2SSS
0AMH14 0421
185.6DAGS
2DAGS
11.8TFC
185.6SAP
133.9TFC
36.4TFC

Properties (6)

additional_info
SC411237
custom_field_two
2
customer
LACSD
datetime
2020-04-29T23:11:36-07:00
documentation
PRO PIPE
is_lateral_inspection
false