Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 19, 2020, 06:29 AM
  • H 0670_H 0669_05182020_235009.mp4

Date
05/18/2020
W/O
828933
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00941
PipeID
P11077
Time
11:29 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7704
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
PICO RIVERA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
03
Purpose
Routine Assessment
Project
RFIR_WO_828933_TV18175_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0670
Downstream MH
H 0669
Dir. of Survey
Downstream
Length Surveyed
517.7 ft.
Total Length
517.7 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
11
Pipe schematic from manhole H 0670 to H 0669
MH: H 0670MH: H 0669downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 06702.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start138.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start138.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish147.2 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start517.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish517.7 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish517.7 ft. AMH - Downstream Manhole, Survey Ends - H 0669517.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    138.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
517.7SSS
0MWL
0MWM
517.7DSZ
517.7AMHH 0669
2.1SAV
2.1SSS
147.2DSZ
138.9SAP
517.7SAP
138.9SAV
0AMHH 0670

Properties (6)

additional_info
SC411361
custom_field_two
2
customer
LACSD
datetime
2020-05-18T23:29:36-07:00
documentation
PROPIPE
is_lateral_inspection
false