Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 20, 2020, 07:50 AM
  • H 0695_H 0694_05202020_011303.mp4

Date
05/20/2020
W/O
828933
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00941
PipeID
P11102
Time
12:50 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7706
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
WHITTIER
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_828933_TV18175_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0695
Downstream MH
H 0694
Dir. of Survey
Downstream
Length Surveyed
692 ft.
Total Length
692 ft.
Structural Index
3
Structural Quick
3Y22
Structural Rating
397
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
399
Pipe schematic from manhole H 0695 to H 0694
MH: H 0695MH: H 0694downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 06950 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2.1 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - MAG COAT47.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish47.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start692 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish692 ft. AMH - Downstream Manhole, Survey Ends - H 0694692 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    47.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
2.1DSZ
692SSS
2.1SAV
47.3SAV
0AMHH 0695
692AMHH 0694
2.1SSS
0MWL
692SAP
0MWM
47.3SAP
2.1MGOMAG COAT

Properties (6)

additional_info
SC411363
custom_field_two
2
customer
LACSD
datetime
2020-05-20T00:50:27-07:00
documentation
PROPIPE
is_lateral_inspection
false