Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 8, 2020, 08:06 PM
  • H 0689_H 0688_06082020_131935.mp4

Date
06/08/2020
W/O
828933
Weather
Dry
Operator/Surveyor
EN. RUIZ
Sewer ID
Z00941
PipeID
P11096
Time
1:06 PM
Certificate
U-116-07001919
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7761
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
WGITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_828933_TV18175_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0689
Downstream MH
H 0688
Dir. of Survey
Downstream
Length Surveyed
489.3 ft.
Total Length
489.3 ft.
Structural Index
3
Structural Quick
3R2Q
Structural Rating
475
O&M Index
2
O&M Quick
2R00
O&M Rating
194
Overall Index
2
Overall Quick
Overall Rating
669
Pipe schematic from manhole H 0689 to H 0688
MH: H 0689MH: H 0688downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 06890 ft. MWM - Water Mark, 30 %of cross sectional area2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO, Start2.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO, Start26.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Start487.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish487.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO, Finish487.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish489.3 ft. AMH - Downstream Manhole, Survey Ends - H 0688

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: NO, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

    2.1 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

    26.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

Observations (10)

DistanceCodeObservation
487.4SSS
489.3AMHH 0688
26.1SSS
0MWL
0AMHH 0689
2.1DAGS
487.4DAGS
0MWM
2.1SAP
487.4SAP

Properties (6)

additional_info
SC411469
custom_field_two
3
customer
LACSD
datetime
2020-06-08T13:06:08-07:00
documentation
PRO PIPE
is_lateral_inspection
false