Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 20, 2020, 09:51 AM
  • H 0680_H 0679_05202020_030633.mp4

Date
05/20/2020
W/O
828933
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00941
PipeID
P11087
Time
2:51 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7706
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
PICO RIVERA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
03
Purpose
Routine Assessment
Project
RFIR_WO_828933_TV18175_MAY2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0680
Downstream MH
H 0679
Dir. of Survey
Downstream
Length Surveyed
379.5 ft.
Total Length
379.5 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole H 0680 to H 0679
MH: H 0680MH: H 0679downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 06802.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start14.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish14.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start379.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish379.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish379.5 ft. AMH - Downstream Manhole, Survey Ends - H 0679

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    14.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
2.3SAV
0MWL
14.9SAV
379.5SSS
0MWM
14.9SAP
379.5SAP
0AMHH 0680
2.3SSS
379.5AMHH 0679

Properties (6)

additional_info
SC411363
custom_field_two
2
customer
LACSD
datetime
2020-05-20T02:51:02-07:00
documentation
PROPIPE
is_lateral_inspection
false