Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 12, 2020, 08:03 AM
  • US_21 0532 _05122020_010925.mp4

Date
05/12/2020
W/O
828762
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00779
PipeID
P24055
Time
1:03 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7658
Sewer Name
21 PHILLIPS BOULEVARD TRUNK
City
POMONA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
21
Purpose
Routine Assessment
Project
WO_828762_TV21017_MAY2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
21 0532
Downstream MH
U-S
Dir. of Survey
Upstream
Length Surveyed
85.6 ft.
Total Length
85.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2B00
O&M Rating
34
Overall Index
2
Overall Quick
Overall Rating
34
Pipe schematic from manhole 21 0532 to U-S
MH: 21 0532MH: U-Supstream0 ft. AMH - Upstream Manhole, Survey Ends - U/S0.9 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish83.6 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start85.6 ft. MWM - Water Mark, 20 %of cross sectional area85.6 ft. AMH - Downstream Manhole, Survey Begins - 21 053285.6 ft. MWL - Water Level, 5 %of cross sectional area

Observation photos (2)

  • Deposits Settled Compacted,  10 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Settled Compacted, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Upstream Manhole, Survey Ends - U/S

    85.6 ft. - Upstream Manhole, Survey Ends - U/S

Observations (6)

DistanceCodeObservation
2DSC
85.6AMHU/S
84.7DSC
0MWM
0AMH21 0532
0MWL

Properties (6)

additional_info
SC411249
custom_field_two
4
customer
LACSD
datetime
2020-05-12T01:03:00-07:00
documentation
PRO PIPE
is_lateral_inspection
false