Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 7, 2020, 06:42 AM
  • 21 0507_21 0506 _05062020_235910.mp4

Date
05/06/2020
W/O
828762
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00779
PipeID
P15717
Time
11:42 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7653
Sewer Name
21 PHILLIPS BOULEVARD TRUNK
City
POMONA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
20
Purpose
Routine Assessment
Project
WO_828762_TV21017_MAY2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
21 0507
Downstream MH
21 0506
Dir. of Survey
Downstream
Length Surveyed
304.8 ft.
Total Length
304.8 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
300
O&M Index
2
O&M Quick
2K00
O&M Rating
120
Overall Index
2
Overall Quick
Overall Rating
420
Pipe schematic from manhole 21 0507 to 21 0506
MH: 21 0507MH: 21 0506downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - 21 05072 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start2.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.8 ft. MGO - General Observation - MAG COATING THROUGHOUT87.1 ft. MGO - General Observation - UNMAPPED MH88.2 ft. MGP - General Photograph - UNMAPPED MH88.2 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK302 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish302.9 ft. MGO - General Observation - COCKROACHES IN MANHOLE302.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish302.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish304.8 ft. AMH - Downstream Manhole, Survey Ends - 21 0506

Observation photos (8)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    2.8 ft. - General Observation - MAG COATING THROUGHOUT

  • General Observation - UNMAPPED MH

    87.1 ft. - General Observation - UNMAPPED MH

  • General Photograph - UNMAPPED MH

    88.2 ft. - General Photograph - UNMAPPED MH

  • General Observation - CONNECTION AT MH 9 O'CLOCK

    88.2 ft. - General Observation - CONNECTION AT MH 9 O'CLOCK

  • General Observation - COCKROACHES IN MANHOLE

    302.9 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (16)

DistanceCodeObservation
0MWM
88.2MGPUNMAPPED MH
87.1MGOUNMAPPED MH
302.9MGOCOCKROACHES IN MANHOLE
2.8SAP
302.9DAGS
304.8AMH21 0506
0MWL
2DAGS
2.8MGOMAG COATING THROUGHOUT
88.2MGOCONNECTION AT MH 9 O'CLOCK
0MGOCOCKROACHES IN MANHOLE
0AMH21 0507
2SSS
302.9SAP
302SSS

Properties (6)

additional_info
SC411244
custom_field_two
3
customer
LACSD
datetime
2020-05-06T23:42:46-07:00
documentation
PRO PIPE
is_lateral_inspection
false