Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 8, 2020, 09:31 AM
  • H 0579_H 0578 _05082020_024207.mp4

Date
05/08/2020
W/O
828833
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00188
PipeID
P11003
Time
2:31 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7655
Sewer Name
H JOINT OUTFALL H - UNIT 8E
City
BALDWIN PARK
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
19
Purpose
Routine Assessment
Project
WO_828833_TV15173_MAY2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
H 0579
Downstream MH
H 0578
Dir. of Survey
Downstream
Length Surveyed
214.8 ft.
Total Length
214.8 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
210
O&M Index
2
O&M Quick
412G
O&M Rating
88
Overall Index
2
Overall Quick
Overall Rating
298
Pipe schematic from manhole H 0579 to H 0578
MH: H 0579MH: H 0578downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 05792 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start33.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"42.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"212.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish212.8 ft. MGO - General Observation - COCKROACHES IN MANHOLE212.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish212.8 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish214.8 ft. MGO - General Observation - CAPPED CONNECTION AT 9 O'CLOCK214.8 ft. AMH - Downstream Manhole, Survey Ends - H 0578

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    212.8 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (15)

DistanceCodeObservation
0MGOCOCKROACHES IN MANHOLE
42.6TFC
214.8MGOCAPPED CONNECTION AT 9 O'CLOCK
0MWL
0MWM
2DAGS
0AMHH 0579
212.8DAGS
2SSS
212.8MGOCOCKROACHES IN MANHOLE
212.8SSS
214.8AMHH 0578
212.8SAV
2SAV
33.3TFC

Properties (6)

additional_info
SC411246
custom_field_two
2
customer
LACSD
datetime
2020-05-08T02:31:00-07:00
documentation
PRO PIPE
is_lateral_inspection
false