Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 5, 2020, 07:38 AM
  • H 0578_H 0577 _05052020_005250.mp4

Date
05/05/2020
W/O
828833
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00188
PipeID
P11002
Time
12:38 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7651
Sewer Name
H JOINT OUTFALL H - UNIT 8E
City
BALDWIN PARK
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
19
Purpose
Routine Assessment
Project
WO_828833_TV15173_MAY2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
H 0578
Downstream MH
H 0577
Dir. of Survey
Downstream
Length Surveyed
132.9 ft.
Total Length
132.9 ft.
Structural Index
3
Structural Quick
3D00
Structural Rating
72
O&M Index
2
O&M Quick
412D
O&M Rating
56
Overall Index
3
Overall Quick
Overall Rating
128
Pipe schematic from manhole H 0578 to H 0577
MH: H 0578MH: H 0577downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 05780 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING THROUGHOUT12.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start38.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"46 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"86.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"119 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"130.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish130.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish132.9 ft. MGO - General Observation - COCKROACHES IN MANHOLE132.9 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK132.9 ft. AMH - Downstream Manhole, Survey Ends - H 0577

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    12.6 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    132.9 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (16)

DistanceCodeObservation
38.2TFC
132.9MGOCOCKROACHES IN MANHOLE
0MWM
130.4DAGS
0MWL
132.9MGOCONNECTION AT MH 9 O'CLOCK
0AMHH 0578
86.5TFC
2DAGS
130.4SAP
132.9AMHH 0577
12.6SAP
46TFC
0MGOCOCKROACHES IN MANHOLE
119TFC
2MGOMAG COATING THROUGHOUT

Properties (6)

additional_info
SC411242
custom_field_two
3
customer
LACSD
datetime
2020-05-05T00:38:14-07:00
documentation
PRO PIPE
is_lateral_inspection
false