Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 5, 2020, 08:22 AM
  • H 0575_H 0574 _05052020_013027.mp4

Date
05/05/2020
W/O
828833
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00188
PipeID
P10999
Time
1:22 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7651
Sewer Name
H JOINT OUTFALL H - UNIT 8E
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
19
Purpose
Routine Assessment
Project
WO_828833_TV15173_MAY2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
H 0575
Downstream MH
H 0574
Dir. of Survey
Downstream
Length Surveyed
91.2 ft.
Total Length
91.2 ft.
Structural Index
3
Structural Quick
3B00
Structural Rating
39
O&M Index
2
O&M Quick
412B
O&M Rating
38
Overall Index
2
Overall Quick
Overall Rating
77
Pipe schematic from manhole H 0575 to H 0574
MH: H 0575MH: H 0574downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - H 05752 ft. MGO - General Observation - MAG COATING THROUGHOUT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start9.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start36.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"44.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"77 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish77 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"89.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish91.2 ft. AMH - Downstream Manhole, Survey Ends - H 0574

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    9.7 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
2MGOMAG COATING THROUGHOUT
0MGOCOCKROACHES IN MANHOLE
77SAP
36.7TFC
89.2DAGS
0MWM
91.2AMHH 0574
77TFC
0MWL
0MGOCONNECTION AT MH 9 O'CLOCK
44.4TFA
2DAGS
0AMHH 0575
9.7SAP

Properties (6)

additional_info
SC411242
custom_field_two
3
customer
LACSD
datetime
2020-05-05T01:22:57-07:00
documentation
PRO PIPE
is_lateral_inspection
false