30 0045_30 0044_632020_001750.mp4
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - General Observation - 95% MAG COAT START
6 ft. - Surface Reinforcement Corroded, from 02 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
21.9 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
77.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO
127.7 ft. - General Observation - 99% MAG COAT START
| Distance | Code | Observation |
|---|---|---|
| 77.6 | SSS | — |
| 0 | MGO | MH CONN 3:00 ACTIVE |
| 2 | SAM | SEVERE AGG |
| 379.1 | SAM | SEVERE AGG |
| 8 | DSZ | SLUDGE |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 379.1 | SSS | BLISTERING PEELING CONCRETE |
| 379.7 | AMH | 12:45AM |
| 379.1 | DSZ | SLUDGE |
| 2 | DAGS | — |
| 21.9 | SAM | SEVERE AGG |
| 379.1 | MGO | MH COMM 2:00 ACTIVE IN STACK |
| 2 | DAGS | — |
| 0 | AMH | 12:15AM |
| 0 | MWM | — |
| 379.1 | MGO | MH CONN 3:00 STUB |
| 379.1 | MGO | MAG COAT 99% FINISH |
| 2 | MGO | 95% MAG COAT START |
| 0 | MWL | — |
| 127.7 | MGO | 99% MAG COAT START |
| 6 | SRC | CIRCUM REBAR |