30 0044_30 0043_642020_005746.mp4
2 ft. - General Observation - MAG COAT 98% START
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 05 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
3.9 ft. - Surface Reinforcement Corroded, from 11 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
36.9 ft. - Surface Aggregate Missing, from 02 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
95.8 ft. - Repair Patch, from 11 to 01 o'clock, within 8 inches of joint: NO - CONCRETE PATCH
95.8 ft. - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
98.6 ft. - Repair Patch, from 11 to 01 o'clock, within 8 inches of joint: NO - CONCRETE PATCH
| Distance | Code | Observation |
|---|---|---|
| 95.8 | RPP | CONCRETE PATCH |
| 115.1 | SSS | BLISTERING PEELING CONCRETE |
| 3.9 | SRC | CIRCUM REBAR |
| 2 | MGO | MAG COAT 98% START |
| 90.9 | DSZ | SLUDGE ROCKS |
| 36.9 | SAM | SEVERE AGG |
| 98.6 | RPP | CONCRETE PATCH |
| 115.1 | DSZ | SLUDGE ROCKS |
| 0 | AMH | 1:00AM |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 0 | MGO | MH CONN 3:00 STUB |
| 2 | DAGS | — |
| 2 | SAM | SEVERE AGG |
| 0 | MWM | — |
| 95.8 | SRC | CIRCUM REBAR |
| 115.1 | SAM | SEVERE AGG |
| 90.9 | DSZ | SLUDGE ROCKS |
| 0 | MWL | — |
| 115.1 | MGO | MAG COAT 98% FINISH |
| 115.6 | AMH | 1:25AM |
| 0 | MGO | MH CONN 2:00 ACTIVE |
| 8 | DAGS | — |
| 26.5 | DSZ | SLUDGE ROOCKS |