30 0054_30 0053_622020_044717.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2 ft. - General Observation - MAG COAT 80% START
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
4.9 ft. - Surface Reinforcement Corroded, from 01 to 03 o'clock, within 8 inches of joint: NO - LONG & CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 266.7 | AMH | 5:50AM |
| 2 | DAGS | — |
| 2 | MGO | MAG COAT 80% START |
| 181.2 | DSZ | SLUDGE |
| 2 | SAM | SEVERE AGG |
| 2 | DSZ | SLUDGE |
| 0 | MGO | MH CONN 3:00 ACTIVE |
| 4.9 | SRC | LONG & CIRCUM REBAR |
| 181.2 | DAGS | — |
| 0 | AMH | 4:30AM |
| 266.2 | SAM | — |
| 266.2 | SSS | — |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 266.2 | MGO | MAG COAT 80% FINISH |
| 0 | DAGS | INSIDE MH |
| 7.5 | SRC | CIRCUM REBAR |
| 0 | MWL | — |
| 81.8 | SRC | CIRCUM REBAR |
| 0 | MWM | — |