30 0056_30 0055_622020_001320.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
2 ft. - General Observation - MAG COAT 99% START
125.9 ft. - Roots Tap Joint, from 10 to 03 o'clock, 15 %, within 8 inches of joint: YESR
125.9 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
129.1 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
130.7 ft. - Roots Tap Barrell, from 08 to 04 o'clock, 15 %, within 8 inches of joint: YES, Start - ROOTS GROWING THROUGH PIPE
| Distance | Code | Observation |
|---|---|---|
| 152.1 | SAM | SEVERE AGG |
| 140.2 | RTB | — |
| 0 | AMH | 12:15AM |
| 152.1 | MGO | MAG COAT 99% FINISH |
| 125.9 | RTJ | — |
| 152.7 | AMH | 12:35AM |
| 152.1 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 130.7 | RTB | ROOTS GROWING THROUGH PIPE |
| 125.9 | SAM | SEVERE AGG |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 2 | MGO | MAG COAT 99% START |
| 0 | MWL | — |
| 129.1 | SAM | SEVERE AGG |
| 0 | MWM | — |