Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 29, 2020, 07:15 AM
  • 21 1034_21 1033A_5292020_010009.mp4

Date
05/29/2020
W/O
0834346
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00784
PipeID
P16138
Time
12:15 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1433R
Sewer Name
21 SAN ANTONIO TRUNK
City
LA VERN
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
06
Purpose
Maintenance Related
Project
20200529MDM_SAN_ANTINO_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Upstream MH
21 1034
Downstream MH
21 1033A
Dir. of Survey
Downstream
Length Surveyed
310.8 ft.
Total Length
310.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
3121
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 21 1034 to 21 1033A
MH: 21 1034MH: 21 1033Adownstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12:55AM16.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped43.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped65.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped93.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped116.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped138.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped166.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped193.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped216.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped243.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped262.8 ft. MGO - General Observation - ABANDONED MH-WOOD CAP265.3 ft. MGO - General Observation - MH CONN 3:00 ACTIVE266.8 ft. MGO - General Observation - WOOD CAP ON MH PULL ROPE270.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped276.1 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open-99% ROOTS276.1 ft. RMC - Roots Medium Connection, at 10 o'clock, 10 %, within 8 inches of joint: YES299.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped310.2 ft. MGO - General Observation - MH CONN 9:00 OPEN310.8 ft. AMH - Downstream Manhole, Survey Ends - 1:25AM

Observation photos (3)

  • General Observation -  ABANDONED MH-WOOD CAP

    262.8 ft. - General Observation - ABANDONED MH-WOOD CAP

  • General Observation - WOOD CAP ON MH PULL ROPE

    266.8 ft. - General Observation - WOOD CAP ON MH PULL ROPE

  • Roots Medium Connection, at 10 o'clock, 10 %, within 8 inches of joint: YES

    276.1 ft. - Roots Medium Connection, at 10 o'clock, 10 %, within 8 inches of joint: YES

Observations (22)

DistanceCodeObservation
216.2TFCCapped
193.2TFCCapped
43.2TFCCapped
116.2TFCCapped
262.8MGOABANDONED MH-WOOD CAP
276.1TFDOpen-99% ROOTS
276.1RMC
65.8TFCCapped
265.3MGOMH CONN 3:00 ACTIVE
266.8MGOWOOD CAP ON MH PULL ROPE
16.2TFCCapped
93.2TFCCapped
310.8AMH1:25AM
310.2MGOMH CONN 9:00 OPEN
243.1TFCCapped
0MWL
299.8TFCCapped
0MWM
138.9TFCCapped
0AMH12:55AM
270.1TFCCapped
166.2TFCCapped

Properties (5)

additional_info
POST ROOT EVALUATION ONLY
customer
LACSD
datetime
2020-05-29T00:15:31-07:00
documentation
MARTIN,OLIVER 111,SHADLER,SKINNER
is_lateral_inspection
false