Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 9, 2020, 07:52 AM
  • 05 1093_05 1092_04092020_010348.mp4

Date
04/09/2020
W/O
818458
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00488
PipeID
P06327
Time
12:52 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7559
Sewer Name
05 MONETA EXTENSION TRUNK, SECTION 1
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_818458_TV05328_MAR2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
05 1093
Downstream MH
05 1092
Dir. of Survey
Downstream
Length Surveyed
320.6 ft.
Total Length
320.7 ft.
Structural Index
3
Structural Quick
3L22
Structural Rating
193
O&M Index
2
O&M Quick
2L00
O&M Rating
130
Overall Index
2
Overall Quick
Overall Rating
323
Pipe schematic from manhole 05 1093 to 05 1092
MH: 05 1093MH: 05 1092downstream0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 10933.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES5.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"6.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start98.5 ft. FC - Fracture Circumferential, from 04 to 06 o'clock, within 8 inches of joint: YES102.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"206.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"316 ft. SSS - Surface Spalling, from 10 to 11 o'clock, within 8 inches of joint: YES320 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish320.7 ft. AMH - Downstream Manhole, Survey Ends - 05 1092320.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish320.7 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK320.7 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Circumferential, from 04 to 06 o'clock, within 8 inches of joint: YES

    98.5 ft. - Fracture Circumferential, from 04 to 06 o'clock, within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
6.8CM
320.7AMH05 1092
206.1TF
0DAGS
0MWL
102.4TF
3.7DAGS
316SSS
320.7CM
320.7MGOCONNECTION AT MH 9 O'CLOCK
0MWM
320DAGS
320.7MGOCONNECTION AT MH 3 O'CLOCK
5.1TF
0AMH05 1093
98.5FC

Properties (6)

additional_info
SC411118
custom_field_two
3
customer
LACSD
datetime
2020-04-09T00:52:43-07:00
documentation
PROPIPE
is_lateral_inspection
false