Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 27, 2020, 09:54 AM
  • B 1095_B 1094 _04272020_031535.mp4

Date
04/27/2020
W/O
823875
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01124
PipeID
P13720
Time
2:54 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7542
Sewer Name
B JOINT OUTFALL B - UNIT 6G
City
SAN GABRIEL
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_823875_TV02344_APR2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
B 1095
Downstream MH
B 1094
Dir. of Survey
Downstream
Length Surveyed
842 ft.
Total Length
842 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole B 1095 to B 1094
MH: B 1095MH: B 1094downstream0 ft. MGO - General Observation - ROACHES IN MH0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 10950 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start841.1 ft. MGO - General Observation - ROACHES IN MH841.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish841.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish842 ft. AMH - Downstream Manhole, Survey Ends - B 1094842 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES IN MH

    841.1 ft. - General Observation - ROACHES IN MH

Observations (11)

DistanceCodeObservation
0MGOROACHES IN MH
0MWL
841.1MGOROACHES IN MH
842AMHB 1094
0AMHB 1095
842MGOCONNECTION AT MH 3 O'CLOCK
841.1SAP
841.1DAGS
0MWM
2DAGS
2SAP

Properties (6)

additional_info
SC411233
custom_field_two
3
customer
LACSD
datetime
2020-04-27T02:54:48-07:00
documentation
PRO PIPE
is_lateral_inspection
false