Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 27, 2020, 10:15 AM
  • B 1094_B 0490_04272020_032952.mp4

Date
04/27/2020
W/O
823875
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01124
PipeID
P13719
Time
3:15 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7542
Sewer Name
B JOINT OUTFALL B - UNIT 6G
City
SAN GABRIEL
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_823875_TV02344_APR2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
B 1094
Downstream MH
B 0490
Dir. of Survey
Downstream
Length Surveyed
303.4 ft.
Total Length
303.4 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole B 1094 to B 0490
MH: B 1094MH: B 0490downstream0 ft. MGO - General Observation - ROACHES IN MH0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 10940 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start301.9 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK301.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish301.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish303.4 ft. AMH - Downstream Manhole, Survey Ends - B 0490303.4 ft. MGO - General Observation - ROACHES AT MH

Observation photos (4)

  • General Observation - ROACHES IN MH

    0 ft. - General Observation - ROACHES IN MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES AT MH

    303.4 ft. - General Observation - ROACHES AT MH

Observations (12)

DistanceCodeObservation
301.9MGOCONNECTION AT MH 3 O'CLOCK
301.9SAP
0MGOROACHES IN MH
303.4AMHB 0490
0MWL
0MWM
0AMHB 1094
303.4MGOROACHES AT MH
2DAGS
2SAP
301.9DAGS
0MGOCONNECTION AT MH 3 O'CLOCK

Properties (6)

additional_info
SC411233
custom_field_two
3
customer
LACSD
datetime
2020-04-27T03:15:51-07:00
documentation
PRO PIPE
is_lateral_inspection
false