Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 15, 2020, 08:21 AM
  • 15 0347_15 0346 _04152020_013656.mp4

Date
04/15/2020
W/O
823765
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00598
PipeID
P12273
Time
1:21 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7523
Sewer Name
15 BALDWIN PARK TRUNK
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
RFIR_WO_823765_TV15018_APR2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
15 0347
Downstream MH
15 0346
Dir. of Survey
Downstream
Length Surveyed
397.8 ft.
Total Length
397.8 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
395
O&M Index
2
O&M Quick
412O
O&M Rating
164
Overall Index
2
Overall Quick
Overall Rating
559
Pipe schematic from manhole 15 0347 to 15 0346
MH: 15 0347MH: 15 0346downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 03470 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start16.7 ft. MGO - General Observation - MAG COATING THROUGHOUT28.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"33 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"73.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"77.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"122.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"126.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"166.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"179.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6"192.4 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6"216 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"224.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"247.7 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"272.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"275.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"283.4 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6"286.2 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6", 6"323.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"329.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"369.9 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6" - GREASE & ROOTS374.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"396.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish396.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish396.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish397.8 ft. AMH - Downstream Manhole, Survey Ends - 15 0346397.8 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (5)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    16.7 ft. - General Observation - MAG COATING THROUGHOUT

  • General Observation - COCKROACHES IN MANHOLE

    397.8 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (32)

DistanceCodeObservation
73.8TFC
2SAP
216TFC
329.2TFC
0AMH15 0347
369.9TFDGREASE & ROOTS
33TFA
28.8TFC
396.3SAP
122.7TFC
323.9TFC
283.4TB
272.2TFC
16.7MGOMAG COATING THROUGHOUT
374.4TFC
192.4TB
77.6TFC
396.3DAGS
275.9TFC
286.2TB
126.4TFC
397.8AMH15 0346
0MWL
2SSS
224.2TFC
0MWM
2DAGS
396.3SSS
166.4TFC
179.3TF
397.8MGOCOCKROACHES IN MANHOLE
247.7TBA

Properties (6)

additional_info
SC411214
custom_field_two
3
customer
LACSD
datetime
2020-04-15T01:21:15-07:00
documentation
PRO PIPE
is_lateral_inspection
false