Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 23, 2020, 04:20 AM
  • F 0176_F 0175 _04222020_221535.mp4

Date
04/22/2020
W/O
824289
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00044
PipeID
P10309
Time
9:20 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7576
Sewer Name
F JOINT OUTFALL F - UNIT 7B
City
NORWALK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
34
Purpose
Routine Assessment
Project
RFIR_WO_824289_TV18094_APR2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
48 in.
Upstream MH
F 0176
Downstream MH
F 0175
Dir. of Survey
Downstream
Length Surveyed
557.1 ft.
Total Length
557.1 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole F 0176 to F 0175
MH: F 0176MH: F 0175downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - F 01765.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start213.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"557.1 ft. AMH - Downstream Manhole, Survey Ends - F 0175 ZOOMED IN557.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
0MGOCONNECTION AT MH 3 O'CLOCK
557.1AMHF 0175 ZOOMED IN
0MWM
5.4SAP
213.7TF
0MWL
0AMHF 0176
557.1SAP

Properties (6)

additional_info
SC411135
custom_field_two
3
customer
LACSD
datetime
2020-04-22T21:20:57-07:00
documentation
PROPIPE
is_lateral_inspection
false