Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 20, 2020, 06:35 AM
  • 01 0643_01 0642_5192020_234127.mp4

Date
05/19/2020
W/O
0829299
Weather
Dry
Operator/Surveyor
U-115-06022630
Sewer ID
Z00212
PipeID
P01142
Time
11:35 PM
Certificate
U-115-06022630
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1423
Sewer Name
01 MOUNTAIN VIEW-BELLE VERNON TRUNK
City
HUNTINGTON PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Routine Assessment
Project
20200519VMR_MOUNTAIN_VIEW_BELLE_VERNON_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
01 0642
Downstream MH
01 0643
Dir. of Survey
Upstream
Length Surveyed
351.2 ft.
Total Length
351.2 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 01 0642 to 01 0643
MH: 01 0642MH: 01 0643upstream0 ft. AMH - Upstream Manhole, Survey Ends - 12:18 am1.1 ft. LFW - Lining Failure Wrinkled, from 12 to 03 o'clock, within 8 inches of joint: YES1.4 ft. LFW - Lining Failure Wrinkled, from 09 to 12 o'clock, within 8 inches of joint: YES17.9 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4" - Open57.8 ft. MGO - General Observation - Seal patch 12:00 to 12:0072.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 05 o'clock, , within 8 inches of joint: NO, Finish72.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 08 o'clock, , within 8 inches of joint: NO, Finish79.6 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4" - Open123.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4" - Open125.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 4" - Open159.4 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4" - Open175.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 4" - Open206.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 4"220.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 4" - Open236.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 4" - Mag Coat xx% 9 to 3 o' Clock Throughout267.2 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4" - Open280.4 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 4" - Open301.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4" - Open349.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 05 o'clock, , within 8 inches of joint: NO, Start349.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 08 o'clock, , within 8 inches of joint: NO, Start351.2 ft. MWM - Water Mark, 30 %of cross sectional area351.2 ft. AMH - Downstream Manhole, Survey Begins - 11:40 pm351.2 ft. MWL - Water Level, 15 %of cross sectional area351.2 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 8"

Observation photos (1)

  • General Observation - Seal patch 12:00 to 12:00

    293.4 ft. - General Observation - Seal patch 12:00 to 12:00

Observations (24)

DistanceCodeObservation
351.2AMH12:18 am
279DAGS
49.7TFOpen
293.4MGOSeal patch 12:00 to 12:00
70.8TFOpen
114.7TFMag Coat xx% 9 to 3 o' Clock Throughout
176TFOpen
227.9TFOpen
0MWM
130.9TFOpen
333.3TFOpen
84TFOpen
0AMH11:40 pm
0MWL
145TFC
350.1LFW
349.8LFW
2DAGS
2DAGS
0TFA
191.8TFOpen
225.9TFOpen
279DAGS
271.6TFOpen

Properties (4)

customer
LACSD
datetime
2020-05-19T23:35:20-07:00
documentation
REVELES, OLIVER III, CASTILLO, SKINNER
is_lateral_inspection
false