C 0386_C 0385_04172020_015716.mp4
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
12.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
20.2 ft. - Infiltration Runner, from 02 to 03 o'clock, within 8 inches of joint: YES
189.7 ft. - Deposits Attached Other, 10 %of cross sectional area, at 02 o'clock, , within 8 inches of joint: NO - MINERAL DEPOSITS
197.2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
397.9 ft. - Infiltration Runner, from 08 to 09 o'clock, within 8 inches of joint: YES
408.5 ft. - Infiltration Runner, at 09 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 197.2 | SRV | — |
| 0 | MWM | — |
| 409.9 | DAGS | — |
| 0 | MWL | — |
| 409.9 | SAP | — |
| 411.3 | AMH | C 0385 |
| 411.3 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 92 | TBA | — |
| 0 | AMH | C 0386 |
| 408.5 | IR | — |
| 397.9 | IR | — |
| 189.7 | DAZ | MINERAL DEPOSITS |
| 409.9 | SRV | — |
| 71.6 | TBA | — |
| 2 | SAP | — |
| 409.9 | SSS | — |
| 20.2 | IR | — |
| 12.2 | SSS | — |
| 189.7 | TBA | — |
| 2 | DAGS | — |