Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 22, 2020, 08:48 AM
  • 15 0232_15 0230_04222020_021435.mp4

Date
04/22/2020
W/O
823759
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00627
PipeID
P12153
Time
1:48 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7535
Sewer Name
15 SAN JOSE CREEK TRUNK
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
33
Purpose
Routine Assessment
Project
RFIR_WO_823759_TV15207_APR2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
15 0232
Downstream MH
15 0230
Dir. of Survey
Downstream
Length Surveyed
653 ft.
Total Length
653 ft.
Structural Index
3
Structural Quick
5Y3Y
Structural Rating
1334
O&M Index
2
O&M Quick
2k00
O&M Rating
444
Overall Index
3
Overall Quick
Overall Rating
1778
Pipe schematic from manhole 15 0232 to 15 0230
MH: 15 0232MH: 15 0230downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 02320 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start171.3 ft. MGO - General Observation - ABANDONED MH193.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS566 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start651 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish651 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish653 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish653 ft. AMH - Downstream Manhole, Survey Ends - 15 0230653 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish653 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish653 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - ABANDONED MH

    171.3 ft. - General Observation - ABANDONED MH

Observations (17)

DistanceCodeObservation
653SSS
2SRV
193.5DSZDEBRIS
653AMH15 0230
566MWLS
0AMH15 0232
651MWLS
2SAP
2SSS
0MWL
653DAGS
171.3MGOABANDONED MH
653DSZ
651SRV
2DAGS
0MWM
653SAP

Properties (6)

additional_info
SC411226
custom_field_two
2
customer
LACSD
datetime
2020-04-22T01:48:54-07:00
documentation
PRO PIPE
is_lateral_inspection
false