Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 1, 2020, 05:40 AM
  • 14 0080_14 0079 _03312020_225625.mp4

Date
03/31/2020
W/O
823698
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00577
PipeID
P18094
Time
10:40 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7508
Sewer Name
14 TRUNK "A"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_823698_TV14039_APR2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
14 0080
Downstream MH
14 0079
Dir. of Survey
Downstream
Length Surveyed
448.6 ft.
Total Length
448.6 ft.
Structural Index
3
Structural Quick
5Q3Q
Structural Rating
885
O&M Index
2
O&M Quick
2Q00
O&M Rating
178
Overall Index
3
Overall Quick
Overall Rating
1063
Pipe schematic from manhole 14 0080 to 14 0079
MH: 14 0080MH: 14 0079downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 00800 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 6 O'CLOCK/ACTIVE2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 35% MAG COAT6.3 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start446.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish446.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish446.8 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish446.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish448.6 ft. AMH - Downstream Manhole, Survey Ends - 14 0079

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    6.3 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
0MWM
6.3SRV
446.8DAGS
2SAP
446.8SSS
448.6AMH14 0079
2SSS
0AMH14 0080
2DAGS
0MWL
2MGO35% MAG COAT
446.8SRV
446.8SAP
0MGOCONN @ MH 6 O'CLOCK/ACTIVE

Properties (6)

additional_info
SC398848
custom_field_two
2
customer
LACSD
datetime
2020-03-31T22:40:58-07:00
documentation
PRO PIPE
is_lateral_inspection
false