Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 2, 2020, 05:10 AM
  • 14 0076_14 0075 _04012020_222647.mp4

Date
04/01/2020
W/O
823698
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00577
PipeID
P18090
Time
10:10 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7509
Sewer Name
14 TRUNK "A"
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_823698_TV14039_APR2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
14 0076
Downstream MH
14 0075
Dir. of Survey
Downstream
Length Surveyed
453.3 ft.
Total Length
453.3 ft.
Structural Index
3
Structural Quick
3Q2Q
Structural Rating
450
O&M Index
2
O&M Quick
412Q
O&M Rating
184
Overall Index
2
Overall Quick
Overall Rating
634
Pipe schematic from manhole 14 0076 to 14 0075
MH: 14 0076MH: 14 0075downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 00760 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start451.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish451.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish451.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish453.3 ft. AMH - Downstream Manhole, Survey Ends - 14 0075

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0MWL
451.9SAP
453.3AMH14 0075
0AMH14 0076
2SSS
2SAP
2DAGS
451.9SSS
0MWM
451.9DAGS

Properties (6)

additional_info
SC398849
custom_field_two
2
customer
LACSD
datetime
2020-04-01T22:10:00-07:00
documentation
PRO PIPE
is_lateral_inspection
false