Wastewater/Activity/PacpInspection/1.0Apr 3, 2020, 08:32 AM
  • 14 0053_14 0052 _04032020_015700.mp4

Date
04/03/2020
W/O
823698
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00577
PipeID
P18065
Time
1:32 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7512
Sewer Name
14 TRUNK "A"
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
06
Purpose
Routine Assessment
Project
RFIR_WO_823698_TV14039_APR2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
14 0053
Downstream MH
14 0052
Dir. of Survey
Downstream
Length Surveyed
508.1 ft.
Total Length
508.1 ft.
Structural Index
2
Structural Quick
3S2V
Structural Rating
535
O&M Index
2
O&M Quick
5141
O&M Rating
235
Overall Index
2
Overall Quick
Overall Rating
770
Pipe schematic from manhole 14 0053 to 14 0052
MH: 14 0053MH: 14 0052downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - 40% MAG COAT0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 00532 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"51.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"76 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"100.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"124.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"148.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"172.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"204.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"228.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"252.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"276.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"300.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"324.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"348.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"372.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"397 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"421 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"430 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start456.1 ft. MWL - Water Level, 50 %of cross sectional area459.3 ft. MWM - Water Mark, 75 %of cross sectional area466.9 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS506 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish506.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish506.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish506.1 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish506.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish508.1 ft. AMH - Downstream Manhole, Survey Ends - 14 0052

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (34)

DistanceCodeObservation
276.4TFC
2SSS
506.1SAP
100.1TFC
0MWM
172.5TFC
0MGO40% MAG COAT
300.5TFC
466.9DSZDEBRIS
506.1SSS
348.9TFC
51.7TFC
2SAP
324.4TFC
397TFC
421TFC
508.1AMH14 0052
124.3TFC
0MWL
148.2TFC
430MWLS
506.1DSZ
0AMH14 0053
76TFC
2DAGS
228.8TFC
204.6TFC
4TFC
252.3TFC
506MWLS
459.3MWM
372.8TFC
456.1MWL
506.1DAGS

Properties (6)

additional_info
SC411201
custom_field_two
2
customer
LACSD
datetime
2020-04-03T01:32:48-07:00
documentation
PRO PIPE
is_lateral_inspection
false