Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 15, 2020, 06:08 AM
  • 15 0364_15 0363 _04142020_231623.mp4

Date
04/14/2020
W/O
823766
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00598
PipeID
P12290
Time
11:08 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7522
Sewer Name
15 BALDWIN PARK TRUNK
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
RFIR_WO_823766_TV15016_APR2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
15 0364
Downstream MH
15 0363
Dir. of Survey
Downstream
Length Surveyed
186.3 ft.
Total Length
186.3 ft.
Structural Index
3
Structural Quick
3F2F
Structural Rating
180
O&M Index
2
O&M Quick
412F
O&M Rating
76
Overall Index
2
Overall Quick
Overall Rating
256
Pipe schematic from manhole 15 0364 to 15 0363
MH: 15 0364MH: 15 0363downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 03640 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 65% MAG COAT THROUGHOUT2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start10 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - UNKNOWN14 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - UNKNOWN72.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"101.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"124.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"129.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"182.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"184 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish184 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish184 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish186.3 ft. AMH - Downstream Manhole, Survey Ends - 15 0363186.3 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
184SSS
0AMH15 0364
0MWL
186.3AMH15 0363
182.1TFA
2SSS
0MWM
184SAP
10TFUNKNOWN
184DAGS
14TFUNKNOWN
2MGO65% MAG COAT THROUGHOUT
186.3MGOCONN @ MH 3 O'CLOCK/ACTIVE
101.1TFA
129.5TFC
72.1TFA
2SAP
124.9TFA
2DAGS

Properties (6)

additional_info
SC411213
custom_field_two
3
customer
LACSD
datetime
2020-04-14T23:08:53-07:00
documentation
PRO PIPE
is_lateral_inspection
false