Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 16, 2020, 07:37 AM
  • 01 1176A_01 1176_04162020_005455.mp4

Date
04/16/2020
W/O
823818
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00225
PipeID
P02029
Time
12:37 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7570
Sewer Name
01 WILCOX AVENUE TRUNK
City
BELL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_823818_TV01257_APR2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 1176A
Downstream MH
01 1176
Dir. of Survey
Downstream
Length Surveyed
191.6 ft.
Total Length
191.7 ft.
Structural Index
3
Structural Quick
3G00
Structural Rating
114
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
3
Overall Quick
Overall Rating
115
Pipe schematic from manhole 01 1176A to 01 1176
MH: 01 1176AMH: 01 1176downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 1176A0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2.1 ft. MGO - General Observation - MAG COAT2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start40.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"48.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"66.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"92.3 ft. RFJ - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YES94.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"102.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"141.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"143.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"182.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"191 ft. MGO - General Observation - SURFACE SPALLING THROUGHOUT THE REACH191.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish191.7 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK191.7 ft. AMH - Downstream Manhole, Survey Ends - 01 1176

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YES

    92.3 ft. - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (19)

DistanceCodeObservation
94.7TF
0AMH01 1176A
0MWL
0MWM
191MGOSURFACE SPALLING THROUGHOUT THE REACH
2.1MGOMAG COAT
0MGOCONNECTION AT MH 3 O'CLOCK
2.1SAV
92.3RFJ
40.9TF
191.7SAV
182.1TF
102.4TF
191.7MGOCONNECTION AT MH 3 O'CLOCK
66.6TF
141.1TF
143.8TF
48.8TF
191.7AMH01 1176

Properties (6)

additional_info
SC411129
custom_field_two
3
customer
LACSD
datetime
2020-04-16T00:37:33-07:00
documentation
PROPIPE
is_lateral_inspection
false