Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 13, 2020, 09:01 AM
  • 01 1183_01 1182_04132020_022002.mp4

Date
04/13/2020
W/O
823723
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00225
PipeID
P02037
Time
2:01 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7562
Sewer Name
01 WILCOX AVENUE TRUNK
City
BELL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
05
Purpose
Routine Assessment
Project
RFIR_WO_823723_TV01072_APR2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 1183
Downstream MH
01 1182
Dir. of Survey
Downstream
Length Surveyed
257.2 ft.
Total Length
257.2 ft.
Structural Index
3
Structural Quick
3I21
Structural Rating
155
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
155
Pipe schematic from manhole 01 1183 to 01 1182
MH: 01 1183MH: 01 1182downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 11830 ft. MWM - Water Mark, 35 %of cross sectional area4.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start11.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"13.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"49.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"51.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"92 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"94.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"176.1 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES180.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"183.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"201 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"256.8 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK256.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish256.8 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK257.2 ft. AMH - Downstream Manhole, Survey Ends - 01 1182

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    176.1 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

Observations (18)

DistanceCodeObservation
49.6TF
256.8MGOCONNECTION AT MH 3 O'CLOCK
92TF
201TF
257.2AMH01 1182
183.6TF
256.8SAP
0MWL
0AMH01 1183
13.8TF
11.3TF
0MWM
51.9TF
256.8MGOCONNECTION AT MH 9 O'CLOCK
4.2SAP
180.9TF
176.1CL
94.9TF

Properties (6)

additional_info
SC411121
custom_field_two
3
customer
LACSD
datetime
2020-04-13T02:01:45-07:00
documentation
PROPIPE
is_lateral_inspection
false