Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 14, 2020, 06:17 AM
  • 01 1152_01 1151_04132020_232605.mp4

Date
04/13/2020
W/O
823723
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00225
PipeID
P02002
Time
11:17 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7563
Sewer Name
01 WILCOX AVENUE TRUNK
City
SOUTH GATE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_823723_TV01072_APR2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
01 1152
Downstream MH
01 1151
Dir. of Survey
Downstream
Length Surveyed
263.1 ft.
Total Length
263.1 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 01 1152 to 01 1151
MH: 01 1152MH: 01 1151downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 11520 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area3 ft. MGO - General Observation - MAG COAT3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start154.2 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6"263.1 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK263.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish263.1 ft. AMH - Downstream Manhole, Survey Ends - 01 1151

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
263.1MGOCONNECTION AT MH 3 O'CLOCK
263.1SAV
0AMH01 1152
0MWL
0MWM
3MGOMAG COAT
3SAV
263.1AMH01 1151
154.2TF

Properties (7)

additional_info
SC411122
custom_field_two
3
customer
LACSD
datetime
2020-04-13T23:17:26-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
10319