Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 19, 2020, 08:26 AM
  • 21 1038_21 1037 _03192020_014304.mp4

Date
03/19/2020
W/O
818333
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00784
PipeID
P16142
Time
1:26 AM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7318
Sewer Name
21 SAN ANTONIO TRUNK
City
POMONA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
03
Purpose
Routine Assessment
Project
RFIR_WO_818333_TV21091_MAR2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
21 1038
Downstream MH
21 1037
Dir. of Survey
Downstream
Length Surveyed
309.5 ft.
Total Length
309.5 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole 21 1038 to 21 1037
MH: 21 1038MH: 21 1037downstream0 ft. AMH - Upstream Manhole, Survey Begins - 21 10380 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start56.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"83.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"106.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"133.4 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"159.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"183.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"205.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"232.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"246 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES259.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"286.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"309.5 ft. AMH - Downstream Manhole, Survey Ends - 21 1037309.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    246 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (18)

DistanceCodeObservation
286.4TF
232.6TFC
133.4TBA
309.5AMH21 1037
0AMH21 1038
246CM
0MWL
0MWM
309.5DAGS
259.5TFC
183.3TFC
83.9TFC
56.2TFC
106.5TFC
0MGOCONNECTION AT MH 9 O'CLOCK
205.7TFC
159.9TFC
2DAGS

Properties (6)

additional_info
SC366945
custom_field_two
3
customer
LACSD
datetime
2020-03-19T01:26:13-07:00
documentation
PRO PIPE
is_lateral_inspection
false