Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 24, 2020, 08:00 AM
  • 21 1008_21 1007 _03242020_011900.mp4

Date
03/24/2020
W/O
818333
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00784
PipeID
P16108
Time
1:00 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7365
Sewer Name
21 SAN ANTONIO TRUNK
City
POMONA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
06
Purpose
Routine Assessment
Project
RFIR_WO_818333_TV21091_MAR2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
21 1007
Downstream MH
21 1008
Dir. of Survey
Upstream
Length Surveyed
264.4 ft.
Total Length
264.5 ft.
Structural Index
4
Structural Quick
4100
Structural Rating
4
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole 21 1007 to 21 1008
MH: 21 1007MH: 21 1008upstream0 ft. AMH - Upstream Manhole, Survey Ends - 21 10082.3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish30.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"33.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"81.6 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"84.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"126.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6"129.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"177.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"181 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"217 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"229.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"257.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start262.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start264.4 ft. MGO - General Observation - CONNECTION AT MH 9 OCLOCK264.4 ft. MWM - Water Mark, 15 %of cross sectional area264.4 ft. AMH - Downstream Manhole, Survey Begins - 21 1007264.4 ft. MWL - Water Level, 10 %of cross sectional area

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.5 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
264.4AMH21 1008
83.4TFC
180.2TFC
35TFC
182.8TFA
0MGOCONNECTION AT MH 9 OCLOCK
135.3TFC
234TFC
0MWM
47.4TFC
231.2TFC
262.1FM
0AMH21 1007
0MWL
137.9TF
2.1DAGS
262.1DAGS
86.5TFC
6.5FM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2020-03-24T01:00:13-07:00
documentation
PRO PIPE
is_lateral_inspection
false