Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 8, 2020, 05:40 AM
  • D 0179_D 0178 _04072020_230342.mp4

Date
04/07/2020
W/O
818287
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00157
PipeID
P10055
Time
10:40 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7556
Sewer Name
D JOINT OUTFALL D - UNIT 6 RELIEF
City
LAWNDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_818287_TV05173_MAR2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
D 0179
Downstream MH
D 0178
Dir. of Survey
Downstream
Length Surveyed
510.1 ft.
Total Length
510.1 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole D 0179 to D 0178
MH: D 0179MH: D 0178downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 5 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - D 01790 ft. MWM - Water Mark, 25 %of cross sectional area6.1 ft. MGO - General Observation - MAG COAT6.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start510 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish510 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish510 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish510.1 ft. AMH - Downstream Manhole, Survey Ends - D 0178

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
510SRV
0MWL
510SAP
510SSS
6.1MGOMAG COAT
0MGOCONNECTION AT MH 5 O'CLOCK
6.1SSS
6.1SRV
510.1AMHD 0178
0AMHD 0179
0MWM
6.1SAP

Properties (7)

additional_info
SC411115
custom_field_two
1
customer
LACSD
datetime
2020-04-07T22:40:21-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
29986