Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 8, 2020, 09:12 AM
  • D 0162_D 0161 _04082020_031555.mp4

Date
04/08/2020
W/O
818287
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00157
PipeID
P10038
Time
2:12 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7556
Sewer Name
D JOINT OUTFALL D - UNIT 6 RELIEF
City
LAWNDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_818287_TV05173_MAR2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
D 0162
Downstream MH
D 0161
Dir. of Survey
Downstream
Length Surveyed
359.7 ft.
Total Length
359.7 ft.
Structural Index
3
Structural Quick
5L3M
Structural Rating
685
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
685
Pipe schematic from manhole D 0162 to D 0161
MH: D 0162MH: D 0161downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - D 01620 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK, ACTIVE0 ft. MWM - Water Mark, 30 %of cross sectional area6.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start28.4 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start359 ft. MGO - General Observation - MAGNESIUM HYDROXIDE COATING, 50%, THROUGHOUT THE REACH359.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish359.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish359.6 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish359.7 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK, ACTIVE359.7 ft. AMH - Downstream Manhole, Survey Ends - D 0161359.7 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK, CAPPED

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    28.4 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
0MWL
359.7MGOCONNECTION AT MH 9 O'CLOCK, ACTIVE
0AMHD 0162
0MGOCONNECTION AT MH 9 O'CLOCK, ACTIVE
6.9SSS
359MGOMAGNESIUM HYDROXIDE COATING, 50%, THROUGHOUT THE REACH
359.7AMHD 0161
28.4SRV
6.9SAP
359.5SSS
359.6SRV
359.4SAP
359.7MGOCONNECTION AT MH 3 O'CLOCK, CAPPED
0MWM

Properties (7)

additional_info
SC411115
custom_field_two
2
customer
LACSD
datetime
2020-04-08T02:12:31-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
29986