03 0367_03 0366_04062020_021815.mp4
2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
79 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, at 12 o'clock, , within 8 inches of joint: YES
79 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES
80.3 ft. - Crack Spiral, from 08 to 12 o'clock, within 8 inches of joint: YES
85.5 ft. - Crack Multiple, from 01 to 02 o'clock, within 8 inches of joint: YES
85.5 ft. - Infiltration Dripper, at 01 o'clock, within 8 inches of joint: YES
104.5 ft. - Crack Spiral, from 10 to 11 o'clock, within 8 inches of joint: YES
104.5 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 12 o'clock, , within 8 inches of joint: YES
104.5 ft. - Infiltration Dripper, at 11 o'clock, within 8 inches of joint: YES
226.3 ft. - Crack Spiral, from 03 to 04 o'clock, within 8 inches of joint: YES
301.7 ft. - Alignment Left, 15 %
| Distance | Code | Observation |
|---|---|---|
| 43.5 | TFA | — |
| 319.8 | AMH | 03 0366 |
| 319.8 | MGO | CONN @ MH 3 OCLOCK/ACTIVE |
| 49.7 | DSF | — |
| 104.5 | CS | — |
| 257.4 | TF | OPEN |
| 0 | MWM | — |
| 185 | TFA | — |
| 0 | MWL | — |
| 104.5 | DAE | — |
| 79 | DAE | — |
| 318.2 | DSF | — |
| 85.5 | CM | — |
| 226.3 | CS | — |
| 2 | DAGS | — |
| 0 | AMH | 03 0367 |
| 87.2 | TB | OPEN |
| 123.6 | TF | OPEN |
| 104.5 | ID | — |
| 85.5 | ID | — |
| 2 | SSS | — |
| 79 | ID | — |
| 317 | SSS | — |
| 301.7 | LL | — |
| 80.3 | CS | — |
| 318.2 | DAGS | — |