Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 1, 2020, 09:16 AM
  • 05 1455_05 1454_512020_033421.mp4

Date
05/01/2020
W/O
0828780
Weather
Dry
Operator/Surveyor
REVELES
Sewer ID
Z00438
PipeID
P06677
Time
2:16 AM
Certificate
U-115-06022630
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1413
Sewer Name
05 EL NIDO TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
22
Purpose
Routine Assessment
Project
20200428VMR_EL_NIDO_TRUNK
Material
NRCP
Shape
Circular
Height
21 in.
Upstream MH
05 1455
Downstream MH
05 1454
Dir. of Survey
Downstream
Length Surveyed
358.5 ft.
Total Length
358.5 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
9
Pipe schematic from manhole 05 1455 to 05 1454
MH: 05 1455MH: 05 1454downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 03:37 am0 ft. MWL - Water Level, 15 %of cross sectional area2.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.3 ft. SAV - Surface Aggregate Visible, at 03 o'clock, within 8 inches of joint: YES, Start - Moderate2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 05 o'clock, , within 8 inches of joint: YES, Start2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES, Start163.4 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"166.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"239 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4" - Open318.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"356.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 05 o'clock, , within 8 inches of joint: YES, Finish356.5 ft. SAV - Surface Aggregate Visible, at 03 o'clock, within 8 inches of joint: YES, Finish356.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish356.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES, Finish358.5 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 8"358.5 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 8"358.5 ft. AMH - Downstream Manhole, Survey Ends - 04:03 am

Observations (18)

DistanceCodeObservation
0MWM
166.2TFC
2.3SSS
0AMH03:37 am
239TFAOpen
356.5DAGS
318.1TFC
163.4TFA
2.3SAVModerate
2.3DAGS
356.5SAV
2.3DAGS
0MWL
358.5TFC
358.5TFA
356.5SSS
358.5AMH04:03 am
356.5DAGS

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2020-05-01T02:16:26-07:00
documentation
REVELES, OLIVER III, CASTILLO, SKINNER
is_lateral_inspection
false