Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 29, 2020, 08:18 AM
  • 05 1464_05 1463_4292020_025332.mp4

Date
04/29/2020
W/O
0828780
Weather
Dry
Operator/Surveyor
REVELES
Sewer ID
Z00438
PipeID
P06686
Time
1:18 AM
Certificate
U-115-06022630
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1408
Sewer Name
05 EL NIDO TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
22
Purpose
Routine Assessment
Project
20200428VMR_EL_NIDO_TRUNK
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
05 1464
Downstream MH
05 1463
Dir. of Survey
Downstream
Length Surveyed
373 ft.
Total Length
373 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
9
Pipe schematic from manhole 05 1464 to 05 1463
MH: 05 1464MH: 05 1463downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02:50 AM2.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 05 o'clock, , within 8 inches of joint: YES, Start2.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 08 o'clock, , within 8 inches of joint: YES, Start2.6 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start3.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start7.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"24.3 ft. SZC - Surface Other Chemical, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - MAG COAT64.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 4"113.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 4"164.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 4"188.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"212.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 4"264.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 4"315.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 4"364.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 4"369.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 08 o'clock, , within 8 inches of joint: YES, Finish369.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish369.5 ft. SZC - Surface Other Chemical, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - MAG COAT369.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 05 o'clock, , within 8 inches of joint: YES, Finish369.5 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish373 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"373 ft. AMH - Downstream Manhole, Survey Ends - 03:28 AM

Observations (24)

DistanceCodeObservation
369.5DAGS
369.5SSS
369.5SZCMAG COAT
369.5DAGS
264.3TFC
2.6DAGS
0MWL
212.9TFC
364.6TFC
2.6DAGS
3.3SSS
113.2TFC
24.3SZCMAG COAT
369.5SAV
164.4TFC
188.9TFC
373TFC
315.9TFC
7.5TF
64.6TFC
373AMH03:28 AM
2.6SAV
0MWM
0AMH02:50 AM