Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 27, 2020, 09:26 AM
  • 08 1642_08 1641_4272020_022950.mp4

Date
04/27/2020
W/O
0823968
Weather
Dry
Operator/Surveyor
REVELES
Sewer ID
Z00539
PipeID
P06865
Time
2:26 AM
Certificate
U-115-06022630
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1405
Sewer Name
05 WEST TORRANCE TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
13
Purpose
Routine Assessment
Project
20200427VMR_WEST_TORRANCE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
08 1642
Downstream MH
08 1641
Dir. of Survey
Downstream
Length Surveyed
275.6 ft.
Total Length
275.6 ft.
Structural Index
2
Structural Quick
3627
Structural Rating
49
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
53
Pipe schematic from manhole 08 1642 to 08 1641
MH: 08 1642MH: 08 1641downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02:30 AM0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 05 o'clock, , within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES, Start5.7 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES5.7 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES17.7 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES17.7 ft. CL - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES20.7 ft. CC - Crack Circumferential, from 10 to 03 o'clock, within 8 inches of joint: YES23.8 ft. CC - Crack Circumferential, from 11 to 12 o'clock, within 8 inches of joint: YES26.9 ft. CC - Crack Circumferential, from 12 to 03 o'clock, within 8 inches of joint: YES30 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES32.9 ft. CC - Crack Circumferential, from 10 to 12 o'clock, within 8 inches of joint: YES36.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"39.4 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES42.3 ft. CC - Crack Circumferential, from 11 to 03 o'clock, within 8 inches of joint: YES45.3 ft. CC - Crack Circumferential, from 09 to 12 o'clock, within 8 inches of joint: YES51.4 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES54.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES66.7 ft. CC - Crack Circumferential, from 09 to 02 o'clock, within 8 inches of joint: YES78.6 ft. CC - Crack Circumferential, from 10 to 02 o'clock, within 8 inches of joint: YES81.7 ft. CC - Crack Circumferential, from 09 to 10 o'clock, within 8 inches of joint: YES84.6 ft. CC - Crack Circumferential, from 10 to 02 o'clock, within 8 inches of joint: YES88 ft. CC - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES93.9 ft. CL - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES96.7 ft. CC - Crack Circumferential, from 09 to 11 o'clock, within 8 inches of joint: YES100 ft. CM - Crack Multiple, from 10 to 03 o'clock, within 8 inches of joint: YES106.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"115.4 ft. CC - Crack Circumferential, from 02 to 03 o'clock, within 8 inches of joint: YES118.1 ft. CM - Crack Multiple, from 10 to 03 o'clock, within 8 inches of joint: YES121.2 ft. CC - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES130.4 ft. CC - Crack Circumferential, from 01 to 03 o'clock, within 8 inches of joint: YES133.5 ft. CC - Crack Circumferential, from 09 to 12 o'clock, within 8 inches of joint: YES136.6 ft. CM - Crack Multiple, from 10 to 03 o'clock, within 8 inches of joint: YES139.5 ft. CC - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES142.5 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES158.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"161.2 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 4"207.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"258.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"272.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 05 o'clock, , within 8 inches of joint: YES, Finish272.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES, Finish275.6 ft. AMH - Downstream Manhole, Survey Ends - 03:35 AM275.6 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 4"

Observations (45)

DistanceCodeObservation
100CM
118.1CM
139.5CC
0AMH02:30 AM
130.4CC
20.7CC
136.6CM
142.5CM
272.4DAGS
158.5TFC
17.7CL
81.7CC
78.6CC
161.2TB
84.6CC
2DAGS
0MWM
66.7CC
275.6AMH03:35 AM
45.3CC
39.4CM
96.7CC
17.7CL
275.6TFA
88CC
54.2CM
5.7CL
106.6TFC
258.9TFC
121.2CC
5.7CL
207.1TFC
42.3CC
30CL
272.4DAGS
93.9CL
0MWL
23.8CC
2DAGS
36.5TFC
133.5CC
51.4CL
32.9CC
115.4CC
26.9CC

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2020-04-27T02:26:56-07:00
documentation
REVELES, OLIVER III, CASTILLO, SKINNER
is_lateral_inspection
false