Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 27, 2020, 08:51 AM
  • 08 1643_08 1642_4272020_015635.mp4

Date
04/27/2020
W/O
0823968
Weather
Dry
Operator/Surveyor
REVELES
Sewer ID
Z00539
PipeID
P06866
Time
1:51 AM
Certificate
U-115-06022630
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1405
Sewer Name
05 WEST TORRANCE TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
13
Purpose
Routine Assessment
Project
20200427VMR_WEST_TORRANCE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
08 1643
Downstream MH
08 1642
Dir. of Survey
Downstream
Length Surveyed
127.3 ft.
Total Length
127.3 ft.
Structural Index
2
Structural Quick
3526
Structural Rating
38
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
42
Pipe schematic from manhole 08 1643 to 08 1642
MH: 08 1643MH: 08 1642downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01:55 AM0 ft. MWM - Water Mark, 40 %of cross sectional area2.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 10 o'clock, , within 8 inches of joint: YES, Start2.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 05 o'clock, , within 8 inches of joint: YES, Start5 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES12.3 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES27.7 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES34 ft. CC - Crack Circumferential, from 11 to 12 o'clock, within 8 inches of joint: YES40.5 ft. CC - Crack Circumferential, from 11 to 01 o'clock, within 8 inches of joint: YES43.1 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES46 ft. CC - Crack Circumferential, from 11 to 03 o'clock, within 8 inches of joint: YES52.3 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES67.7 ft. CC - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES73.2 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES79.2 ft. CC - Crack Circumferential, from 09 to 11 o'clock, within 8 inches of joint: YES82.4 ft. CC - Crack Circumferential, from 10 to 02 o'clock, within 8 inches of joint: YES85.5 ft. CC - Crack Circumferential, from 02 to 03 o'clock, within 8 inches of joint: YES88.3 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES88.3 ft. CC - Crack Circumferential, from 12 to 02 o'clock, within 8 inches of joint: YES100.9 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES100.9 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES103.9 ft. CL - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES110 ft. CC - Crack Circumferential, from 09 to 10 o'clock, within 8 inches of joint: YES113.1 ft. CC - Crack Circumferential, from 10 to 12 o'clock, within 8 inches of joint: YES116.2 ft. CC - Crack Circumferential, from 03 to 04 o'clock, within 8 inches of joint: YES119.1 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES126 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 10 o'clock, , within 8 inches of joint: YES, Finish126 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 05 o'clock, , within 8 inches of joint: YES, Finish127.2 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 4"127.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"127.3 ft. AMH - Downstream Manhole, Survey Ends - 02:26 AM

Observations (32)

DistanceCodeObservation
113.1CC
116.2CC
127.3AMH02:26 AM
88.3CL
88.3CC
127.2TFC
0MWL
2.4DAGS
126DAGS
100.9CL
43.1CM
82.4CC
27.7CL
40.5CC
127.2TFC
100.9CL
73.2CM
79.2CC
46CC
34CC
0AMH01:55 AM
67.7CC
103.9CL
2.4DAGS
0MWM
126DAGS
110CC
119.1CL
52.3CM
85.5CC
5CM
12.3CM

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2020-04-27T01:51:14-07:00
documentation
REVELES, OLIVER III, CASTILLO, SKINNER
is_lateral_inspection
false