Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 28, 2020, 06:08 AM
  • 22 0296_22 0295_01272020_221831.mp4

Date
01/27/2020
W/O
808204
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16582
Time
10:08 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7288
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
32
Purpose
Routine Assessment
Project
RFIR_WO_808204_TV22014_JAN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0296
Downstream MH
22 0295
Dir. of Survey
Downstream
Length Surveyed
315.4 ft.
Total Length
315.4 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
310
O&M Index
2
O&M Quick
2K00
O&M Rating
124
Overall Index
2
Overall Quick
Overall Rating
434
Pipe schematic from manhole 22 0296 to 22 0295
MH: 22 0296MH: 22 0295downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02962 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start46.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"57.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"126.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"180.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"232.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"313.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish313.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish313.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish315.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0295315.4 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
315.4AMH22 0295
313.4DAGS
0MGOCONNECTION AT MH 3 O'CLOCK
313.4SSS
57.8TFA
2SSS
0MWL
232.9TFA
180.4TFA
126.9TFA
0MWM
2DAGS
313.4SAP
0AMH22 0296
2SAP
315.4MGOCONNECTION AT MH 3 O'CLOCK
46.2TFC

Properties (6)

additional_info
SC398774
custom_field_two
2
customer
LACSD
datetime
2020-01-27T22:08:06-08:00
documentation
PRO PIPE
is_lateral_inspection
false